The ET-ISB Div. I Suspension and ET-ISB Division IV Vacuum and Cryogenics are organizing this joint workshop to advance ET-LF TM tower integration concepts following the discussion at last ET-ISB Fall workshop and ET annual meeting
The workshop objectives are the following:
- Overview on present super-attenuator (SA) design concepts / developments
- Integration of SA in LF TM towers (options, constraints, requirements)
- Planning towards a LF TM tower baseline design
- Note that a baseline is needed for the infrastructure planning, i.e. the cavern concept.
- The baseline shall not prevent us from developing / integrating smarter solutions in the future.
The meeting will last 2 full days: from 25 March starting at noon to 27 March until noon
There will be no registration fee but registration is mandatory to access the lab.
Lunches will be taken at the CESFO canteen (16.47 € per lunch in cash).
Registration
Registration for this event is currently open.