6–10 May 2024
MECC
Europe/Rome timezone

Signal-recycling cavity lock with a sub-carrier laser

P#04
7 May 2024, 17:30
1h 30m
MECC

MECC

Poster Instrument Science Board (ISB) Posters

Description

The current error signal for the SRC length control, based on the frontal modulation scheme, is sub-optimal for a detuned operation of the interferometer. At the GEO600 detector, we tested a new SRC locking technique that is more suitable for transitioning the detector to a detuned state. The new technique is based on detecting changes in the SRC length by injecting an auxiliary sub-carrier field from the dark port of the interferometer. The sub-carrier field shares the same path with the squeezed light.

Primary author

Fabio Bergamin

Presentation materials