2nd SPB Workshop

Europe/Rome
Thiessen Wineries, Maastricht, Netherlands

Thiessen Wineries, Maastricht, Netherlands

Thiessen Wineries, Maastricht, Grote Gracht 18, 6211SW, Maastricht, The Netherlands. https://thiessen.nl/ Apart from a centuries-old wine shop where you can buy world-famous wines, Thiessen is one of Maastricht's finest event venues for groups of max 50 people. The beautiful city building –located in Maastricht’s center– with its historic atmosphere and variety of spaces, is an ideal place for both the plenary parts of our workshop (max 50 attendants) and the informal discussions during the breaks. Lunch will be served in the wine cellars where also the workshop dinner on Tuesday evening will take place.
Domenico D'Urso, Franck Linde, Wim Walk (Nikhef)
Description

The 1st Site Preparation Board (SPB) Workshop was from 8-11 November 2021, Nuoro, Sardina (IT). The sequel will take place from23-26 January 2023, Maastricht (NL). This will be the occasion to discuss and get updates on the various activities taking place at the sites aspiring to possibly host the future Einstein Telescope (Sardegna in Italy, EMR partially in Belgium, Germany & The Netherlands and possibly Lausitz in Germany). In particular (hydro)geology aspects, noise environment, legal/permitting affairs, bidbook organization, schedules, excavation costs, local funding and future plans, etc. will be discussed. Apart from plenary presentations, lots of time will be reserved for discussions. 

The venue of the workshop is Thiessen Wineries, Maastricht, Grote Gracht 18, 6211SW, Maastricht, The Netherlands. See: https://thiessen.nl/. A maximum of 50 participants can be hosted in person. A video (Zoom) link will be provided to allow remote attendance.

Registration is required for both in person (fee: €200, now closed) and online (no fee, open till end of workshop) participation.

Registration
online participation (no fee)
54 / 100
Participants
  • Achim Stahl
  • Alain Dassargues
  • Alba Romero-Rodríguez
  • Alessandro Parisi
  • Alexander Sevrin
  • Ali Mohammadi
  • Andreas Freise
  • Andreas Kemna
  • Andreas Rietbrock
  • Ben Telkamp
  • Bjorn Vink
  • Carlo Giunchi
  • Chiara Arina
  • Christian Stegmann
  • Christoph Butscher
  • Christophe Collette
  • Davide Rozza
  • Domenico D'Urso
  • Dorota Rosinska
  • Edit Fenyvesi
  • Federico Paoletti
  • Fernando Ferroni
  • Francesca Badaracco
  • Francesco Dessì
  • Frank Fischer
  • Frank Linde
  • Frederic Nguyen
  • gaetano schillaci
  • Giacomo Bruno
  • Gianluca Gemme
  • Gieljan de Vries
  • giorgio spada
  • Giovanni Borasi
  • Giovanni Luca Cardello
  • Hans-Balder Havenith
  • Harald Lück
  • Helmut Wannenmacher
  • Irene Fiori
  • Jan Harms
  • Jean-Pierre Locquet
  • Jean-René Cudell
  • Joost Hase
  • Joris van Heijningen
  • Jose Cembranos
  • Josiah Ensing
  • Katharina Henjes-Kunst
  • Luca D'Onofrio
  • Luca Deidda
  • Luca Massaro
  • Luca Naticchioni
  • Maria Concetta Tringali
  • Maria Elina Belardinelli
  • maria marsella
  • maria teresa melis
  • Mario Martinez
  • Marius Waldvogel
  • Mariusz Suchenek
  • Martin Panzner
  • massimiliano razzano
  • Massimo Nespoli
  • Matteo Di Giovanni
  • Matyas Vasuth
  • Michele Maggiore
  • Michele Punturo
  • Miriam Roelofs
  • Myrna Staring
  • Nick Van Remortel
  • Nikesh Yadav
  • Nils Chudalla
  • Patrick Werneke
  • Patryk Lason
  • Paul Kuijer
  • Peter Achtziger-Zupancic
  • Peter Nelemans
  • Philippe Orban
  • Pooya Hamdi
  • Rob van der Meer
  • Roberto Passaquieti
  • Rosario De Rosa
  • Ruben Snellings
  • Rudy Swennen
  • Shahar Shani-Kadmiel
  • Silvano Tosi
  • Silvia Piranomonte
  • Soumen Koley
  • souvik agasti
  • stan bentvelsen
  • Stefan Hild
  • Steffen Grohmann
  • Takaaki Yokozawa
  • Tatsuki Washimi
  • Teng Zhang
  • Tomasz Bulik
  • Valentina Mangano
  • Wim Walk
  • Yannick Forth
  • Zhengwen Liu
    • 08:30
      Arrival and Registration
    • Welcome + general introduction

      ‘Introductions’, including:
      Venue, views from SPB co-chairs, view from ET management, links with Infradev ET/PP, COBA status i.e. L versus Triangle and SPB considerations herein, ET Bidbook preparations planning/expectations

      Conveners: Domenico D'Urso, Dr Wim Walk (Nikhef)
    • 13:05
      Lunch
    • ‘Impact on ET performance’, including: ISB point of view, KAGRA experience, seismic, acoustic, magnetic measurements at sites, connections with external noise sources like sea, wind turbines, trains, roads/bridges, mining, etc., impact on ET duty cycle of e.g. seismic activity, Newtonian Noise & Newtonian Noise compensation

      ISB point of view, KAGRA experience, seismic, acoustic, magnetic measurements at sites, connections with external noise sources like sea, wind turbines, trains, roads/bridges, mining, etc., impact on ET duty cycle of e.g. seismic activity, Newtonian Noise & Newtonian Noise compensation

    • ‘Impact on ET performance’, including: ISB point of view, KAGRA experience, seismic, acoustic, magnetic measurements at sites, connections with external noise sources like sea, wind turbines, trains, roads/bridges, mining, etc., impact on ET duty cycle of e.g. seismic activity, Newtonian Noise & Newtonian Noise compensation

      ISB point of view, KAGRA experience, seismic, acoustic, magnetic measurements at sites, connections with external noise sources like sea, wind turbines, trains, roads/bridges, mining, etc., impact on ET duty cycle of e.g. seismic activity, Newtonian Noise & Newtonian Noise compensation

    • 11:10
      Coffee/tea
    • ‘Impacts on ET costs/risks=excavations’, including: Geological & Hydrogeological campaigns (boreholes, passive seismic, active seismic, electromagnetic- and gravimetric imaging, etc.) and modelling, where do the sites stand w.r.t. ET implementation i.e. potential corner points, future investigations: goals, planning and funding: morning

      ‘Impacts on ET costs/risks=excavations’, including: Geological & Hydrogeological campaigns (boreholes, passive seismic, active seismic, electromagnetic- and gravimetric imaging, etc.) and modelling, where do the sites stand w.r.t. ET implementation i.e. potential corner points, future investigations: goals, planning and funding

    • 13:10
      Lunch
    • ‘Impacts on ET costs/risks=excavations’, including: Geological & Hydrogeological campaigns (boreholes, passive seismic, active seismic, electromagnetic- and gravimetric imaging, etc.) and modelling, where do the sites stand w.r.t. ET implementation i.e. potential corner points, future investigations: goals, planning and funding: afternoon

      ‘Impacts on ET costs/risks=excavations’, including: Geological & Hydrogeological campaigns (boreholes, passive seismic, active seismic, electromagnetic- and gravimetric imaging, etc.) and modelling, where do the sites stand w.r.t. ET implementation i.e. potential corner points, future investigations: goals, planning and funding

      • 24
        EMR ET site, cross-border groundwater model: conceptual model and first calibration (Alain Dassargues) ('20+'10)
      • 25
        Ground vertical displacements of NE Sardinia (20'+10')
        Speaker: Dr Francesco Dessì
      • 26
        Resistivity and induced polarisation surveys : results from deep and azimuthal surveys (Yannick Forth and Joost Hase)
      • 15:40
        Coffee/tea
      • 27
        EM Geomodelling @ EMR and feasibility in Sardinia (Martin Panzner, EMerald Geomodelling)
      • 28
        Geological Field Investigations, Drilling Programs and Geophysical Logging (Pooya Hamdi)
      • 29
        Active seismic surveys in the EMR (Marius Waldvogel)
      • 30
        Active and passive seismic surveys in the EMR (Soumen Koley)
        Speaker: Soumen Koley (Nikhef)
      • 31
        SWANS - Surface-Wave Ambient Noise Seismic Tomography (Myrna Staring, Fugro)
      • 32
        Closing of the 2nd day + Organisational announcements
    • Workshop dinner

      Workshop dinner

    • Welcome + general introduction

      ‘Introductions’, including:
      Venue, views from SPB co-chairs, view from ET management, links with Infradev ET/PP, COBA status i.e. L versus Triangle and SPB considerations herein, ET Bidbook preparations planning/expectations

    • 13:00
      lunch
    • ‘Wrap up, Schedule, …’, including: Site differential implications on ET performance & ET costs/risks, realistic schedule estimates for each site, (urgently) required inputs (L versus Triangle?), actions required, conclusions

      ‘Wrap up, Schedule, …’, including:
      Site differential implications on ET performance & ET costs/risks, realistic schedule estimates for each site, (urgently) required inputs (L versus Triangle?), actions required, conclusions

    • ‘Tour’, including: ETpathfinder, beer brewery, mine… ETpathfinder

      ETpathfinder

      ETpathfinder Duboisdomein 30 6229 GT, Maastricht The Netherlands

      ‘Tour’, including:
      ETpathfinder, beer brewery, mine…

      • 43
        ETpathfinder visit: Duboisdomein 30, Maastricht (Paul Kuijer)
      • 10:00
        bathroom break + to the bus ETpathfinder

        ETpathfinder

        ETpathfinder Duboisdomein 30 6229 GT, Maastricht The Netherlands
      • 44
        Bus to ValDieu Brewery: Val Dieu 225, 4880 Aubel, Belgium Bus

        Bus

      • 45
        Visit brewery + lunch ValDieu Brewery

        ValDieu Brewery

        ValDieu Brewery: Val Dieu 225, 4880 Aubel, Belgium
      • 13:30
        bathroom break + to the bus
      • 46
        Bus to Blegny Mine Bus

        Bus

      • 47
        Visit Blegny Mine Blegny Mine

        Blegny Mine

      • 16:15
        to the bus
      • 48
        Bus back to Maastricht (precise location TBC) Bus

        Bus